Knowledge base

Technology Validation

Proven Performance: FastOx® Gasification Technology

Sierra Energy’s FastOx gasification technology has been developed and tested at bench and pilot scales.

Bench-Scale Success: The RETC Facility

Initial bench-scale testing was conducted on a 2 metric tons per day (MTPD) system at the Renewable Energy Testing Center (RETC) in Sacramento, California, from 2009 to 2013. This phase supported validation of the technology's performance on numerous waste streams and informed the design of the pilot system.

Extensive Feedstock Testing: The RETC system completed 67 test runs across a diverse range of feedstocks:

Traditional fuels like charcoal briquettes, lump charcoal, metallurgical coke, and oil shale.

Biomass materials including woodchips, ecopellets, and walnut shells.

Complex waste streams such as mixed plastics, glass, shredded tires, and simulated municipal solid waste (MSW).

Validated Outputs & Environmental Safety

High-Quality Syngas: Syngas composition and quality were monitored using Real-Time Gas Analysis Equipment to evaluate performance and validate syngas properties as a function of feed composition.

Safe, Usable Slag: Slag samples were tested under the U.S. EPA Toxicity Characteristic Leaching Procedure (TCLP) and were found to satisfy applicable TCLP criteria for non-hazardous status.

Valuable Byproducts: The slag was evaluated and determined to meet California Department of Transportation requirements as a Class 2 alternative base material, supporting its potential use as a replacement aggregate.

Pilot-Scale Demonstration: Fort Hunter-Liggett

Building on this success, a 10 MTPD demonstration pilot was deployed at Fort Hunter-Liggett in Monterey County, California, operating from 2018 to 2023. The demonstration efforts advanced the process to Technology Readiness Level (TRL) 7.

Demonstrated Efficiency and Reliability

Extensive Operation: Following commissioning in 2018, the unit completed 13 test campaigns, logging a total of 1,500 hours of operation.

Real-World Fuel Processing: The majority of testing successfully utilized refuse-derived fuel (RDF) derived from municipal solid waste.

Clean Syngas Production: The system demonstrated the production of clean, energy-dense syngas suitable for power generation in an internal combustion generator.

High Efficiency: Sierra Energy achieved Cold Gas Efficiency (CGE) of 81% on the RDF feedstock.

Predictable Production: Slag composition and production were validated and found to meet expectations based on previous RETC testing.

Continuous Innovation: The 100 MTPD Commercial Offering

Pilot testing allowed several improvements to be implemented, generating new intellectual property and advancing the system's design. The following enhancements have been tested or designed for inclusion in Sierra Energy’s upcoming 100 MTPD commercial offering:

Enhanced Material Handling: Improved solid material feed systems to handle a wider range of waste feedstocks.

Durability Upgrades: More reliable injection lances and water-cooled, refractory-lined support for materials in the high-temperature zone.

Streamlined Design: The gasifier and polisher have been combined into a single vessel, reducing costs and improving operability.

Optimized Control: Advanced control strategies are designed to improve syngas yield and improve polisher tar destruction.

Advanced Gas Cleaning: Features include alkali sorbent-based dry-gas cleaning for halide removal and centrifuge treatment of wet-gas cleaning water to remove soot and recycle it back to the gasifier.

To validate these improvements at the pilot scale, a second-generation demonstration gasifier has been designed, fabricated, and delivered to Fort Hunter-Liggett for installation.

Got a question?

Ask our FastOx gasification assistant

Important Information Before You Continue

This site contains information about potential territorial distribution opportunities for FastOx® gasification technology. The materials are provided for business evaluation and discussion purposes only.

The site includes market-size information, equipment-value calculations, project-economics models, ROI estimates, sales estimates, profit estimates, compensation illustrations, environmental estimates, project pipeline information, technical descriptions, projections, forecasts, scenarios, and other forward-looking or assumption-based information. This information is based on Sierra Energy's current information, third-party sources, internal models, and assumptions that may change. It is not based on actual distributor results, completed distributor-originated projects, completed FastOx unit sales under this program, or actual territory performance.

Any projections, forecasts, models, estimates, scenarios, illustrations, or similar information on this site are illustrative and assumption-based. They are not guarantees, warranties, commitments, or promises of actual results. Actual results may differ materially from the information presented on this site. Sierra Energy does not represent that any project, sale, deployment, revenue, compensation, profit, return, market share, customer demand, territory value, environmental result, financing, permit, regulatory approval, or other outcome will occur or be achieved.

Any territorial distribution rights will be available only under a definitive written agreement signed by Sierra Energy and the approved distributor. Nothing on this site creates a franchise, dealership, agency, partnership, joint venture, technology license, operating right, authority to bind Sierra Energy, or right to sell, supply, operate, service, or sublicense FastOx gasification technology, FastOx units, or other Sierra Energy technology or equipment.

By continuing, you acknowledge that you have read and understand this information, including that financial, market, project, environmental, and other potential results presented on this site may be based on assumptions and modeling rather than actual distributor, project, or territory results, and that actual results may differ materially. You should rely on your own diligence and any definitive written agreement you sign with Sierra Energy, not on this site as a substitute for those materials.